Silverdale, WA 98383
ph: (360) 588-2124 Washington
fax: (503) 296-2374
alt: (503) 624-2050 Oregon
fcf
Yamhill River Bridge: Concrete Enterprises – General Contractor, completed 2006.
Baker Creek Bridge: Mowat Construction – General Contractor, completed 2006.
OR 224: East Portland-SE Evelyn Street: Wildish – General Contractor completed 2006.
OR 99E Howell Prairie-Waconda: Morse Brothers – General Contractor, completed 2005.
Hwy 47 Verboort-Purdin: Kerr Contractors – General Contractor, completed 2005.
Camelot Phase 2 (Sylvan Interchange): A $24 million highway project including 2 bridges with Mowat Construction as the General Contractor. Completed 2002.
ZigZag – Rhodenderon, Phase 2: Total Construction cost of $3.5 million with Mowat Construction as the general contractor. Completed in 2004.
Beaverton – Tigard Highway, Multnomah County Line Section: $4.5 million highway project with Morse Bros. Inc. as the General contractor. Completed 2004
Strassel Road, Highway 26: $500,000 project completed in 2004. Eagle-Elsner was the general contractor on this project.
Broadway Bridge Renovation: Completed 2004. Project to rebuild the aging Broadway bridge across the Willamette River. Mowat Construction Company was the general contractor on this project.
I-205 Multi-Use Path: Pedestrian / bicycle bridge over SE Powell Boulevard and associated approaches with Cascade Bridge as the General Contractor. Completed 2004.
Columbia River – Willamette River Phase 1 Section, I-205: $18 million update to 6 miles of Interstate 205 with J.W. Fowler as the General Contractor. Completed 2004.
Copyright 2009 Ford Engineering, Inc.. All rights reserved.
Silverdale, WA 98383
ph: (360) 588-2124 Washington
fax: (503) 296-2374
alt: (503) 624-2050 Oregon
fcf